Temporary Water Transfer System

Our client required an on-pond water transfer system to replace a shore based system that was being impacted due to lowering pond water levels.  The client required  a highly compressed schedule to have the new system operational within 4 months.

GN2 performed:

  • Design Basis Memorandum

  • HAZOP Facilitation

  • Hydraulic analysis of water transfer system and downstream tailings systems

  • Control narratives

  • Barge stability and mooring analysis

  • Detailed engineering of two barges and associated on shore distribution piping to plants 

Fit for purpose design in schedule driven project