Project Name: Demonstration Pit Lake
Services Provided: Scoping Studies and Detailed Engineering
Discipline(s): Mechanical, Structural, Civil, Process, Electrical, Instrumentation and Automation/Controls
Budget: $15M-$20M
Duration: 1.5 yr
Scope Summary
The client required a process and automated control system that could provide tailings water at a low and controlled flow rate to containment cells for filtration and reclamation purposes. The system was designed to take water batches from different sources onsite, store the water at a central tank farm, and distribute the water in a controlled manner.