Description
- 3 months to 2 years
- 1M - 100M
- Alberta
GN2 has successfully completed multiple coarse tailings Projects of various levels of complexity, these include:
- Urethane lined pipe replacements Projects.
- Urethane lined pipe extension and relocations.
- Stress reduction initiatives, to reduce the observed stress in the pipelines seen by maintenance crews, making their work safer.
As these assets are core to a successful oilsands operation, GN2 emphasizes a need on “how-to” perform the work through 3D modelling the execution steps to ensure successful completion of the Project without affecting the operation of the asset.
Project Name: Tailings Line Infrastructure – Multiple Projects
Services Provided: Detailed Engineering
Discipline(s): Mechanical and Structural
Budget: $1M – $100M
Duration: 3 months to 2 years
Scope Summary
The objective of this Project was to replace six (6) tailings pipelines and to engineer design improvements to reduce pipe stress in critical areas. This included modifications to existing supports and anchors, installation of bends with tight angular tolerances, and the addition of flex spools (rubber hoses) to accommodate pipe movement. GN2 completed both the detailed design and procurement of the piping items in time for the scheduled Line Shut Downs (LSDs).