Project Name: NCP Deadleg Mitigation

Services Provided: Detailed Engineering

Discipline(s): Electrical

Budget: $ 200k

Duration: 1 yr

Scope Summary

The objective of this Project was to eliminate freezing points caused by small amounts of water in the diesel system that has settled into low points. The detailed engineering included the design of electrical heat trace and connection into existing EHT controllers, as well as pipe insulation systems. GN2 completed both the detailed design and project cost estimate.