Pipelines
GN2 has successfully completed multiple coarse tailings Projects of various levels of complexity, these include:
As these assets are core to a successful oilsands operation, GN2 emphasizes a need on “how-to” perform the work through 3D modelling the execution steps to ensure successful completion of the Project without affecting the operation of the asset.
Project Name: Tailings Line Infrastructure – Multiple Projects
Services Provided: Detailed Engineering
Discipline(s): Mechanical and Structural
Budget: $1M – $100M
Duration: 3 months to 2 years